Water System Expansion

Upper Sandusky, Ohio

Budget

$ 8 million

Size

?

Scope

Brandstetter Carroll Inc. has been involved in water system improvements in Upper Sandusky, Ohio, since 1983.  Projects include hydraulic modeling, design of new elevated water storage tank, utility rate studies,  annual CCR reports, reservoir capacity analysis, raw water pump stations, booster stations, river crossings and numerous waterline extensions and replacements. The firm also has been involved in building improvements at the water plant, filter analysis and the design of a new bulk water sales facility.

Example Projects 

  • Reservoir Capacity Analysis
  • Sandusky River Crossing
  • South Side Water Extension
  • Raw Waterline and Pump Station
  • Elevated Water Storage Tank
  • Water Tower Hydraulic Modeling
  • State Route 30 Booster Station
  • Malabar Drive
  • Commerce Way Industrial Park
  • State Route 63 Water Extension
  • State Route 30 Water Extension
  • State Route 199 Water Extension
  • State Route 82 Water Extension
  • Reservoir Road Water Extension
  • Industrial Road Water Extension
  • Elliott Drive Water Extension
  • Bulk Water Facility
  • CR330 Waterline Extension
  • Bigelow Street Waterline Replacement
  • Tarhe Trail Water and Sewer Extension

The estimated total value of these projects exceeds $8 million.